Ceramic stone plate paste hanging method

Specific steps:
1, primary treatment: For pasting construction, flatness is especially important grassroots, grass-roots should be smooth but not calendered. Its tolerance is: surface roughness deviation ± 2mm, yin and yang angle vertical deviation ± 2mm, facade vertical deviation ± 2mm.

2, according to design drawings, carefully verify the actual size of the grassroots and deviations, and put bombs aspect baseline.

3, according to the size of sub-grid plate put in Wall base plate block elastic line of position, and review verification, to ensure that accurate.

4, to determine the position of the sheet and paste points and do the drilling process. (Pore diameter φ10 ~ φ12mm)

5, remove the adhesive substance is not conducive to the primary surface of the wall, dust and ceramic stone plate on the back of the hole, the mortar, grunge, floating pine, etc., manual removal may be difficult to completely remove the angle grinder. Also make sure the surface is dry grass, firm not loose.

6, after the gel according to the drawings required to gum paste and put it on a predetermined point, wiping glue thickness should be greater than the back plate to the wall grassroots clearance distance 5mm.

7, after the microcrystalline stone wall paste, according to the horizontal leveling with a spirit level correction.

8, after a microcrystalline stone positioned to deal with the adhesive to be checked, if necessary, to add rubber reinforcement.